Drainflow Carries Out Groundwork Checks on a West London Build
Acton is a key development zone for commercial builds like this new data centre in West London, so construction moves fast, but aggregate, silt, and site washings go straight into fresh drainage runs during construction leaving a mess underground. Before the data centre can go live, therefore, those pipes need to run clear and show no structural faults. Drainflow was contracted to carry out a pre-handover clean and survey.





